Question: SCM 435 Exam 2 (Type 2) Problem 1 (20 points). Sawing Sanding Assembly 6 units/hr 6 units/hr 0.7 units/hr Welding Assembly 2 units/hr 0.7 units/hr

SCM 435 Exam 2 (Type 2) Problem 1 (20 points).

SCM 435 Exam 2 (Type 2) Problem 1 (20 points). Sawing Sanding Assembly 6 units/hr 6 units/hr 0.7 units/hr Welding Assembly 2 units/hr 0.7 units/hr Drilling Assembly 2.4 units/hr 0.7 units/hr 1) Which operation is the bottleneck? 2) What is the bottleneck cycle time? 3) What is the throughput time of overall operation? 4) If the firm works 8 hours per day, 20 days per month, what is the monthly capacity of the manufacturing process