Question: Section B-Network Design Having chosen the software project, you are now provided with a work breakdown structure (WBS) for the project, provided by your IT

Section B-Network Design Having chosen the software project, you are now provided with a work breakdown structure (WBS) for the project, provided by your IT department. These estimates are based on four similar software installations completed during the past two years. ID Predecessor A Duration 2 10 B A 3 D A A B 2 E 6 F C 10 G E 1 H Activity SW Decision Stakeholder Input ID Data Sources DB Setup Draft UI Design Data Cleaning Spec Workstation UI Testing Data Validation DB Test Order workstations UI Sign off Load data Install workstations Integrate UI, Database Final User test E 15 1 F 12 D, F 5 K G 20 H 1 L M 4 N 8 o K LM NO 5 8 Construct a network design logic diagram using this WBS. Use the ID and activity description to clearly identify each note. Complete a forward pass and backward pass and identify the slack times. Identify and clearly indicate the critical path. Discuss critical path sensitivity, and how sensitive this network is to changing the critical path. iv)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
