Question: Section I - Numerical Calculations ( 5 0 % ) In a residential building project, a value engineering exercise was carried out on the roofing

Section I - Numerical Calculations (50%)
In a residential building project, a value engineering exercise was carried out on the
roofing materials of the clubhouse. It is intended to revise the roofing materials from
composite aluminum roof cladding to 200mm thick. grade C45D20 concrete flat roof
with greenery above.
a. Advise the cost implication for the proposed change based on the BQ rates and
assumptions provided below:-
Assumptions:
Roof area:
40m30m=1,200m2
Steel ratio:
200kgm3
All steel bar required are 16mm dia. and below
BQ Rates:
C45/20 w/p reinforced concrete for suspended slabs; 200mm thk. $1,400m3
16mm dia. and below bars; hot rolled deformed high yield $10kg
Swan formwork to soffit of suspended slabs
Swan formwork; edges and breaks in slabs; n.e.300mm
$300m2
Design, supply and install roof greenery
$100m
Design, supply and install composite aluminum roof cladding
b. After confirmation of adopting reinforced concrete roof with greenery features, the
Structural Engineer further advised that the rebar adopted was revised from 16mm
diameter to 25mm diameter. There is no relevant BQ rates available for rebar
diameter over 25mm. Assess the cost implication based on the following
assumptions: -
Assumptions:
Wastage of rebar:
Profit and overhead of the contractor:
Cost of rebar (all diameters):
Total bars required in kg :
Mass of rebar per linear meter:
Productivity for fixing rebar in different dia.
3%
10%
$3,500/tonne
same as the weight in (a)
1.579kg16mm3.854(25mm)
assume the same
Section I - Numerical Calculations ( 5 0 % ) In a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!