Question: Select the incorrect statement: For a generator operating in steady - state, Pmech = Pele. In an interconnected power system, all generators need to be

Select the incorrect statement:
For a generator operating in steady-state, Pmech = Pele.
In an interconnected power system, all generators need to be in synchronism.
If generators in a power system are not able to maintain synchronism after a fault, the system is said to be transiently unstable.
q,
A power system can operate with generators at different frequency levels.