Question: Send all answer by using Flexsim . On before paint area assembly line in a compary 5 different parts are assumbled. Parts are transported by

Send all answer by using Flexsim . On before paint area assembly line in a compary 5 different parts are assumbled. Parts are transported by an automsted conveyor [max speed 5mmin system. Pait 1 and 4 are corring directly on assembly line while parts 2,3 and 5 are procersed bofore getting assembled for 4,4 and 5 minutes respectively. After assombly, a forkift (max speed 10mmin) is carrying two assemblies at a time, up to the shipping point. Each assembly takes 4 minute to complete, Raw material arrival is as indicated here:
\table[[Resonrce,Arrival time],[Part 1,Exponential (0,5,0) Minutes],[Part 2,8 Minutes],[Part 3,7 Minutes],[Part 4,Exponental (0,7,0) Minutes],[Part 5,8 Minutes]]
Find:
1.Throughput of shop floor. (Run time: see from the sheet provided an gleare portal).
2. Find Utilization of resources.
3. Suggestions for optimizing the shop floor
 Send all answer by using Flexsim . On before paint area

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!