Question: Send step by step procedure by using Flexsim and provide what input I can provide. On before paint area assembly line in a company 5
Send step by step procedure by using Flexsim and provide what input I can provide.
On before paint area assembly line in a company different parts are assembled. Parts are transported by an automated conveyor max speed system. Part and are coming directly on assembly line while parts and are processed before getting assembled for and minutes respectively. After assembly, a forklift max speed is carrying two assemblies at a time, up to the shipping point. Each assembly takes minute to complete. Raw material arrival is as indicated here:
tableResourceArrival timePart Exponential MinutesPart MinutesPart MinutesPart Exponential MinutesPart Minutes
Find:
Throughput of shop floor. Run time: see from the sheet provided on elsarn portal
Find Utilization of resources.
Suggestions for optimizing the shop floor
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock