Question: Send step by step procedure by using Flexsim and provide what input I can provide. On before paint area assembly line in a company 5

Send step by step procedure by using Flexsim and provide what input I can provide.
On before paint area assembly line in a company 5 different parts are assembled. Parts are transported by an automated conveyor ( max speed 5mmin) system. Part 1 and 4 are coming directly on assembly line while parts 2,3 and 5 are processed before getting assembled for 4,4 and 5 minutes respectively. After assembly, a forklift ( max speed 10mmin) is carrying two assemblies at a time, up to the shipping point. Each assembly takes 4 minute to complete. Raw material arrival is as indicated here:
\table[[Resource,Arrival time],[Part 1,Exponential (0,5,0) Minutes],[Part 2,8 Minutes],[Part 3,7 Minutes],[Part 4,Exponential (0,7,0) Minutes],[Part 5,8 Minutes]]
Find:
1.Throughput of shop floor. (Run time: see from the sheet provided on elsarn portal).
2. Find Utilization of resources.
3. Suggestions for optimizing the shop floor
 Send step by step procedure by using Flexsim and provide what

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!