Question: show step by step work for each part Supoose that a metal rod is supposed to be cut 518mm, in length. The upper spec limt
show step by step work for each part
Supoose that a metal rod is supposed to be cut 518mm, in length. The upper spec limt is set at 52.9mm, and the lower spec lmit set at 50.7mm. A metal rod that is out of spec must be scrapped at a cost of $34.00. The company uses the Taguchi Quality Loss Function to estimate qualify costs. Suppose that a sample of three units was taken, and the rod measurements were: 51.9,51.2, and 53.7mm, retpectively. What is the fotal Taguchi Quaily Cost of that sample of three units? a) The Taguchi parameter T is: :/mm2 (round your response to two decimal places). b) The Taguchi Quality Cost of the first metal cod is \$ (round your responise to two decimal places). c) The Taguchi Quality Cost of the second metal rod is 5 (round your response to two docimal placos). d) The Taguchi Quality Cost of the third metal rod is ? (round your respanse to two decimal placess). e) What is the total Taguch/ Oualty Cost of that sample of Uiree units? (round your response to two decimal places)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
