Question: SimProcess An assembly line has 4 stations. Station 1 is for operation a. Station 2 is for operation b. Station 3 is for operation c.
An assembly line has 4 stations. Station 1 is for operation a. Station 2 is for operation b. Station 3 is for operation c. Part A needs operation a before going to the final assembly, and part B needs operation b before going to the final assembly. Part C needs operation c. The final assembly at station 4 needs one output from operation a and b each, and three outputs from c operation. Draw a SIMPROCESS model and explain each activity in details. How do you prove that the line has been balanced
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts