Question: Single plantwide factory overhead rate Bach Instruments Inc. makes three musical instruments: flutes, darinets, and oboes. The budgeted factory overhead cost is $93,000. Overhead
Single plantwide factory overhead rate Bach Instruments Inc. makes three musical instruments: flutes, darinets, and oboes. The budgeted factory overhead cost is $93,000. Overhead is allocated to the three products on the basis of direct labor hours. The products have the following budgeted production volume and direct labor hours per unit: Flutes Clarinets Oboes Budgeted Production Volume 1,900 units 700 1,100 Direct Labor Hours Per Unit 0.5 1.5 1.0 If required, round all per unit answers to the nearest cent. a. Determine the single plantwide overhead rate. 265 X per direct labor hour b. Use the overhead rate in (a) to determine the amount of total and per-unit overhead allocated to each of the three products. Flutes Total Factory Overhead Cost 1,060,00 X Per Unit Factory Overhead Cost 530 X Clarinets 1,192,50 X 795 X Oboes 695,625 X 0.5 X Total 2,958,12 X
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
