Question: Site 10 specific construction hazards and rate them using a 3x3 Risk Matrix for risk analysis. Give control measure(s) for. (just give the specific work
Site 10 specific construction hazards and rate them using a 3x3 Risk Matrix for risk analysis. Give control measure(s) for. (just give the specific work activity, hazards, existing controls if any, and control measures)
Details:
Likelihood
1. unlikely - occurs during accident breakdown or emergency situation
2. likely - occurs during regular scheduled practice i.e. monthly or yearly maintenance
3. almost - occurs during normal everyday practice.
Severity
1. Minor - superficial injuries, nuisance, irritation, ill health leading to temporary discomfort.
2. Major - Lacerations, burns, fractures deafness, dermatitis, ill-health leading to permanent minor disability.
3. catastrophic - Amputations, Major fractures, Fatal injuries, severe life shortening diseases
3x3 risk matrix for analysis
| severity | |||
| likelihood | minor 1 | major 2 | catastrophic 3 |
| almost 3 | M(3) | M(6) | H(9) |
| likely 2 | L(2) | M(4) | M(6) |
| unlikely 1 | L(1) | L(2) | L(3) |
High risk: STOP/investigate the process and implement controls immediately
Medium risk: keep the process going; however, a control plan must be developed and should be implemented as soon as possible
Low risk: keep the process going, but monitor regularly. A control plan should also be investigated
Hierarchy of controls:
Elimination
Substitution
Engineering Controls
Administrative Controls
Personal Protective Equipment
Work activities:
assembling of formworks and erection of scaffolding on high-rise buildings
10 x 32 sqm footing foundation excavation
Assembling of steel structures such as flange beams through welding
painting of walls on the second and third floor of a 3 storeys building
Pouring of floor slab at second or upper floors
Erection of steel columns
Installation of steel trusses and roofing
Piledriving of reinforced concrete piles in bridge construction
Launching of girders, and placing it on bridge abutment in bridge construction
installation of glass wall in high rise buildings
breaking and dismantling of damaged road and pavement using hydraulic breaker attached to backhoe operated and pneumatic jackhammers operated by operators/workers
erection of transmission towers (power distribution lines, telecommunication lines)
HAZAR IX IDENTIFICATION, RISK ASSESSMENT and CONTROL (HIRAC) Form Group No. HAZAR IX IDENTIFICATION, RISK ASSESSMENT and CONTROL (HIRAC) Form Group No
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts