a) Stakeholder analysis is undertaken by the project leader of six sigma project in a define phase.
Question:
a) Stakeholder analysis is undertaken by the project leader of six sigma project in a define phase. Show that what does stakeholder analysis identify and why might it be useful?
b) Process capability is the central tool in six sigma approach. Explain what is meant by process capability. Define the “Sigma Score” of a process. Draw a diagram showing a “5
sigma” process.
c) A product has a nominal length of 11cm. The tolerance associated with this dimension is +0.5cm and -0.5cm. Inspection is carried out on the length and it is found that the mean length is 10.9cm with the standard deviation of 0.47cm.
i. Calculate the natural process limits.
ii. State the specification limits.
ii. Construct process showing all the four limits. In addition, shade the proportion of the product that is outside specification.
iv. Calculate both capability indices.
Materials and process in manufacturing
ISBN: 978-0471656531
9th edition
Authors: E. Paul DeGarmo, J T. Black, Ronald A. Kohser