Question: So for this question my instructor provided a cheat sheet, and in that the answers of Max crash time are = 10 weeks, total direct
So for this question my instructor provided a cheat sheet, and in that the answers of Max crash time are = 10 weeks, total direct cost or maximum crash time = 1320, optimum crash point = 11 weeks, with a total of 2130 dollars.
Can you please solve this problem and get the answers as provided in the cheat sheet. Thanks.
Your Project has indirect costs of 100 per week with a total of $1,600 at 16 weeks. Your Direct Costs for the Project at Normal time and cost are $680.00 at a duration of 16 Crash Cost Max Crash Time Activity Normal time Normal Cost A 4 30 10 70 1 2 B 7 60 C 0 0 1 80 D 30 2 4 40 E 50 3 5 110 F 200 3 5 90 1 60 G H 40 40 2 2 1 70 0 0 2 140 Project Duration 16 weeks Direct Cost at 16 days = $680.00 C 1 X 5 D 4 1 2x 2 B 7 E H 2 5 Maximum Crash Time? Weeks 5 pts. Total Direct cost at Maximum Crash Time? What is the Optimum Crash Point weeks dollars 5 pts. dollars 10 pts
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts