Question: SOLUTIONS TO BSAN 3 0 1 : SAMPLE EXAM 3 SPRING 2 0 2 4 1 . The time from when a patient is discharged
SOLUTIONS TO BSAN : SAMPLE EXAM SPRING
The time from when a patient is discharged from Metropolitan General Hospital to the time
the discharged patients bed is ready to be assigned to a new patient is referred to as the bed
assignment turnaround time. If the bed turnaround time is excessive, it can cause problems
with patient flow and delay medical procedures throughout the hospital. This can cause long
waiting times for physicians and patients thus creating customer dissatisfaction. The
admissions RN has assigned a patient care associate to measure the bed turnaround time for a
randomly selected bed each morning, afternoon, and evening for days see Excel file
Day Bed Turnaround Times min Part a Part b
Sample Sample Mean Sample Range
a points Calculate the sample means. Put your answers in the table above.
b points Calculate the sample ranges. Put your answers in the table above.
c points Calculate the upper control limit UCL and lower control limit LCL for the
Xbar chart.
d points Calculate the upper control limit UCL and lower control limit LCL for the
Rchart.
e points Construct the Xbar chart.
f points Construct the Rchart.
g points Is the process under statistical process control? Explain your answer.
Webster Chemical Company produces mastics and caulking for the construction industry. The
product is blended in large mixers and then pumped into tubes and capped. Webster is
concerned whether the filling process for tubes of caulking is in statistical control. The process
should be centered on ounces per tube. Six samples of tubes are taken and each tube is
weighed in ounces.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock