Question: Solve A through D A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously

A production process at Kenneth Day Manufacturing is shown in the figure Solve A through D

A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 2.4 units/hr Sawing 1.8 units/hr Sanding Drilling 5 units/hr Welding 5 units/hr Assembly 0.7 units/hr Assembly 0.7 units/hr Assembly 0.7 units/hr a) Sanding is the bottleneck. b) The bottleneck time is 33.34 minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places). d) If the firm operates 11 hours per day, 20 days per month, the monthly capacity of the manufacturing process is 396 units (enter your response as a whole number).

Step by Step Solution

3.50 Rating (143 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

In the step 2 the drilling operation and sanding operation happen simultaneously and a product will ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!