Question: solve it by details by hand please Question 2 Seven cities are being considered as potential locations for the construction of at most four wastewater

solve it by details by hand please
Question 2
Seven cities are being considered as potential locations for the construction of at most four wastewater treatment plants. The following table provides the data for the situation. Missing links indicate that a pipeline cannot be constructed.
Cost ($) of pipeline construction between cities per 1000galhr capacity
\table[[To,1,2,3,4,5,6,7],[From,,100,,200,,50,],[1,,,,120,,150,],[3,400,,,,120,,90],[4,,,120,,120,,],[5,,200,,,,100,200],[6,,110,180,,,70,],[7,200,,,150,,,],[\table[[Cost($ million) of],[plantconstruction]],1.00,1.20,2.00,1.60,1.80,0.90,1.40],[Population (1000s),50,100,45,90,75,60,30]]
The capacity of a pipeline (in gallons per hour) is a direct function of the amount of wastewater generated, which is a function of the populations. Approximately 500 gallons per 1000 residents are discharged in the sewer system per hour. The maximum plant capacity is 100,000galhr. Determine the optimal location and capacity of the plants.
 solve it by details by hand please Question 2 Seven cities

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!