Question: solve it please 3 . Point A lies in the middle of a clayey sand layer with thickness ( = 1 0 mathrm
solve it please Point A lies in the middle of a clayey sand layer with thickness mathrm~mphiprime cprime kPa and mathrmKmathrmo The ground surface is flat. The site is saturated.
a Use a compass to draw the MC for point A on the space shown on the right.
b Use a protractor and a ruler or red id to draw the failure envelope of the soil.
c A planned construction operation will cause the vertical effective stress at point A to rise to kPa The horizontal effective stress will remain unchanged. Will point A reach failure due to the planned construction operation?