Question: SOLVE YOUR HANDWR TTEN . Consider a workstation with 1 1 machines ( in parallel ) , each requiring one hour of process time per
SOLVE YOUR HANDWRTTEN Consider a workstation with machines in parallel each requiring one hour of process
time per job with Each machine costs $ Orders for jobs arrive at a rate of
per hour with and must be filled. Management has specified a maximum allowable
average response time ie time a job spends at the station of two hours. Currently it is just
over three hours check it
Analyze the following options for reducing average response time.
a Perform more preventive maintenance so that and are reduced, but
remains the same. This cost $ and does not improve the average process time but
does reduce to one.
b Add another machine to the workstation at a cost of $ The new machine is
identical to existing machines, so and
c Modify the existing machines to make them faster without changing the SCV at a cost of
$ The modified machines would have and
What is the best option?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
