Question: Spreadsheet Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as personal, eight percent; fatigue, five percent; delay,

Spreadsheet Nine observations from a work
Spreadsheet Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as personal, eight percent; fatigue, five percent; delay, six percent. Use the Work Measurement Excel template to determine the standard time for this operation Work Observation Element ! 2 3 4 5 6 7 8 Performance Rating A 0.09 0.12 0.07 0.06 0.10 0.09 0.13 0.12 0.13 855 0.24 0.18 0.22 0.20 0.27 0.24 0.29 0.26 0.26 1001 C 0.47 0.40 0.47 0.44 0.19 0.19 0.40 0.47 0.49 1154 D 0.63 0.67 0.65 0.59 0.72 0.70 0.70 0.67 0.71 95% E 0.72 0.77 0.72 0.70 0.81 0.82 0.76 0.B: 0.81 RSS F 1.03 1.03 0.98 1.00 1.10 1.11 1,03 1.09 1.11 90% Round your answer to two decimal places minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!