Question: SPRING, 2 0 2 4 PROBLEM 1 A concrete, which reaches the maturity for demolding at 2 0 C in 7 days, was exposed to

SPRING, 2024
PROBLEM 1
A concrete, which reaches the maturity for demolding at 20C in 7 days, was exposed to ambient conditions with a temperature of 16C for 16 hours and 6C for the rest of the day for 3 days and 10C for 16 hours and -1C for the rest of the day for 4 days, respectively.
a) Determine the total time required for demolding if the concrete is assumed to be exposed to ambient conditions with an average temperature of 16C.
b) Determine the compressive strength of concrete for each maturity degree and k2=6.6MPaC. days