Question: Standard Production Time (min) Setup Run Preparation Artwork & Generation 29 0.000 Inspect & Shear 20 0.500 Puch Tooling Holes 10 0.500 Image Transfer
Standard Production Time (min) Setup Run Preparation Artwork & Generation 29 0.000 Inspect & Shear 20 0.500 Puch Tooling Holes 10 0.500 Image Transfer Drill Manual CNC Metallization DRFP Panel Prep Laminate and Expose Develop Electroplate Strip DRFP Etch & Tin Strip Fabrication Soldermask Solder Dip Profile September's Production Orders Boards 8 88 50 799 60 5,761 5,761 Setup September's Total Standard Production Run (in min) (in hours) 1,450 1,450 24.2 1,200 360 1,560 26.0 600 360 960 16.0 240 15 0.080 51 936 765 37,440 38,205 636.8 0.004 9 4,825 2,160 9,650 11,810 196.8 0.750 60 5,761 600 540 1,140 19.0 0.200 2.000 0.200 8.500 0.200 0.200 g g gg g g 60 5,761 300 144 444 7.4 60 5,761 1,200 1,440 2,640 44.0 60 5,761 1,200 144 1,344 22.4 60 5,761 1,500 6,121 7,621 127.0 60 5,761 300 144 444 7.4 60 5,761 600 144 744 12.4 45 1.500 55 5,744 2,475 1,077 3,552 59.2 30 0.500 55 5,744 1,650 359 2,009 33.5 Punch Press 50 1.000 47 1,224 2,350 1,224 3,574 59.6 CNC Router 150 0.500 6 4,331 900 2,166 3,066 51.1 Inspect, Test, Pack 45 1.500 60 5,761 2,700 8,642 11,342 189.0 TOTAL 21,950 69,955 91,905 1,531.7
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
