Question: Standard Work Combination Sheet (2) Draw a Standards Work Combination Sheet (Standard Operations Routine Sheet) for the following operations to be done in a cell.

Standard Work Combination Sheet (2) Draw a
Standard Work Combination Sheet (2) Draw a
Standard Work Combination Sheet (2) Draw a Standards Work Combination Sheet (Standard Operations Routine Sheet) for the following operations to be done in a cell. The TAKT time is 140 sec. Use walk time of 5 sec between all operations. The machines are not automated. Operation Saw Drill Lathe Deburr Inspect Manual time, sec 20 10 20 20 40 Machine time. sec 20 40 50 Draw a cell layout of the cell (Standard Operations Sheet). Standard Operations Routine Sheet Seq. Operation No. Description Time in seconds Manual Machine Wa Time o Auto Tume Use Appropriate Time Scale Wait Time Standard Work Combination Sheet (2) Draw a Standards Work Combination Sheet (Standard Operations Routine Sheet) for the following operations to be done in a cell. The TAKT time is 140 sec. Use walk time of 5 sec between all operations. The machines are not automated. Operation Saw Drill Lathe Deburr Inspect Manual time, sec 20 10 20 20 40 Machine time. sec 20 40 50 Draw a cell layout of the cell (Standard Operations Sheet). Standard Operations Routine Sheet Seq. Operation No. Description Time in seconds Manual Machine Wa Time o Auto Tume Use Appropriate Time Scale Wait Time

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!