Question: Statement T/F If it is False, why and what makes it correct? 2-1. Extra-processing and Overproduction are basically the same. 2-2. The best process architecture

Statement

T/F

If it is False, why and what makes it correct?

2-1. Extra-processing and Overproduction are basically the same.

2-2. The best process architecture for producing large volumes of highly standard products is a flow shop architecture

2-3. Financial metrics can only show the past performance of a business, and cannot be used for controlling future performance

2-4. To cope with increasing demand, the production must take less time per each product

2-5. Reducing the duration of the non-critical path of a process helps shortening the process.

2-6. A flow unit is the item that is being processed throughout a process

2-7. Process Cost and Flow time are among External metrics

2-8. Delay is one of the eight types of waste.

2-9. Inventory is considered as a waste type, because its storage and holding requires cost

2-10. When a highly flexible job shop is utilized to produce only one type of product, out of pocket costs will be incurred.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!