Question: Statement T/F If it is False, why and what makes it correct? 2-1. Extra-processing and Overproduction are basically the same. 2-2. The best process architecture
| Statement | |
| T/F | If it is False, why and what makes it correct? |
| 2-1. Extra-processing and Overproduction are basically the same. | |
| 2-2. The best process architecture for producing large volumes of highly standard products is a flow shop architecture | |
| 2-3. Financial metrics can only show the past performance of a business, and cannot be used for controlling future performance | |
| 2-4. To cope with increasing demand, the production must take less time per each product | |
| 2-5. Reducing the duration of the non-critical path of a process helps shortening the process. | |
| 2-6. A flow unit is the item that is being processed throughout a process | |
| 2-7. Process Cost and Flow time are among External metrics | |
| 2-8. Delay is one of the eight types of waste. | |
| 2-9. Inventory is considered as a waste type, because its storage and holding requires cost | |
| 2-10. When a highly flexible job shop is utilized to produce only one type of product, out of pocket costs will be incurred. |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts