Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations....
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using job #1 Cost Sheet and Job #2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis. Table Top $1,900.00 $600.00 Table Leg Drawer $390.00 The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 12 direct labor hours worked during the month. The estimated manufacturing overhead cost for the month is: a. Factory supervisor salary per month b. Rent for the factory per month $4,500.00 $1,500.00 $600.00 $6,600.00 Depreciation of factory equipment per month Total Estimated manufacturing overhead What is the predetermined manufacturing overhbad rate? Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your job #1. Step 3 The customer that has ordered job #2, wants a table that is the same as job #1, but wants to also add a drawer to the table. Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense. Advertising expenses, and Depreciation expense. C Raw Materials purchased on account, $19,000. 5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: There are three assembly employees that spend 2 hours each, $25 per hour to make the table for job # 1. (After you journ. this entry please enter the information into Job #1 Cost Sheet) Salary for supervisor of the factory $5,000. Administrative Salary $2,000. 15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $1,500. 17-Dec Advertising costs incurred but not paid for the month was $1,200. 20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities). 22-Dec Manufacturing overhead cost was applied based on direct labor hours to job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet) 26-Dec Job #1 was completed and transferred to Finishell Goods during the month. 28-Dec The completed table from Job #1 was sold on account to the customer for $24,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $25 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet) Manufacturing overhead cost was applied based on direct labor hours to job #2 based on the POHR. Only three direct labor bure wara nad on Inh #7 during the month /Aftar uninurnalin this B 31. Dar 1-Dec 31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the er have been posted. Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS tab for job #1 and job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint: This is the company's first month of operations and therefore the beginning balances wi Step 6 be zero.) Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab. Answer the additional questions below Step 8 Check Figure: Cost of Goods Manufactured-$7,750, Net operating income-$10,750 What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? Viriat is the ending Dalance for work in process: What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? What is the adjusted cost of goods sold? What is gross margin? What is the total prime cost for job#1? What is the total conversion cost for job #1? What is the total product cost for job#1? What was the period cost incurred for the month of December? What is the total variable cost incurred for job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fiked.)? What is the contribution margin for job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)? What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is with in the relevant range? Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using job #1 Cost Sheet and Job #2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis. Table Top $1,900.00 $600.00 Table Leg Drawer $390.00 The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 12 direct labor hours worked during the month. The estimated manufacturing overhead cost for the month is: a. Factory supervisor salary per month b. Rent for the factory per month $4,500.00 $1,500.00 $600.00 $6,600.00 Depreciation of factory equipment per month Total Estimated manufacturing overhead What is the predetermined manufacturing overhbad rate? Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your job #1. Step 3 The customer that has ordered job #2, wants a table that is the same as job #1, but wants to also add a drawer to the table. Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense. Advertising expenses, and Depreciation expense. C Raw Materials purchased on account, $19,000. 5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: There are three assembly employees that spend 2 hours each, $25 per hour to make the table for job # 1. (After you journ. this entry please enter the information into Job #1 Cost Sheet) Salary for supervisor of the factory $5,000. Administrative Salary $2,000. 15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $1,500. 17-Dec Advertising costs incurred but not paid for the month was $1,200. 20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities). 22-Dec Manufacturing overhead cost was applied based on direct labor hours to job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet) 26-Dec Job #1 was completed and transferred to Finishell Goods during the month. 28-Dec The completed table from Job #1 was sold on account to the customer for $24,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $25 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet) Manufacturing overhead cost was applied based on direct labor hours to job #2 based on the POHR. Only three direct labor bure wara nad on Inh #7 during the month /Aftar uninurnalin this B 31. Dar 1-Dec 31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the er have been posted. Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS tab for job #1 and job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint: This is the company's first month of operations and therefore the beginning balances wi Step 6 be zero.) Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab. Answer the additional questions below Step 8 Check Figure: Cost of Goods Manufactured-$7,750, Net operating income-$10,750 What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? Viriat is the ending Dalance for work in process: What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? What is the adjusted cost of goods sold? What is gross margin? What is the total prime cost for job#1? What is the total conversion cost for job #1? What is the total product cost for job#1? What was the period cost incurred for the month of December? What is the total variable cost incurred for job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fiked.)? What is the contribution margin for job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)? What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is with in the relevant range? Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using job #1 Cost Sheet and Job #2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis. Table Top $1,900.00 $600.00 Table Leg Drawer $390.00 The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 12 direct labor hours worked during the month. The estimated manufacturing overhead cost for the month is: a. Factory supervisor salary per month b. Rent for the factory per month $4,500.00 $1,500.00 $600.00 $6,600.00 Depreciation of factory equipment per month Total Estimated manufacturing overhead What is the predetermined manufacturing overhbad rate? Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your job #1. Step 3 The customer that has ordered job #2, wants a table that is the same as job #1, but wants to also add a drawer to the table. Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense. Advertising expenses, and Depreciation expense. C Raw Materials purchased on account, $19,000. 5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: There are three assembly employees that spend 2 hours each, $25 per hour to make the table for job # 1. (After you journ. this entry please enter the information into Job #1 Cost Sheet) Salary for supervisor of the factory $5,000. Administrative Salary $2,000. 15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $1,500. 17-Dec Advertising costs incurred but not paid for the month was $1,200. 20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities). 22-Dec Manufacturing overhead cost was applied based on direct labor hours to job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet) 26-Dec Job #1 was completed and transferred to Finishell Goods during the month. 28-Dec The completed table from Job #1 was sold on account to the customer for $24,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $25 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet) Manufacturing overhead cost was applied based on direct labor hours to job #2 based on the POHR. Only three direct labor bure wara nad on Inh #7 during the month /Aftar uninurnalin this B 31. Dar 1-Dec 31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the er have been posted. Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS tab for job #1 and job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint: This is the company's first month of operations and therefore the beginning balances wi Step 6 be zero.) Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab. Answer the additional questions below Step 8 Check Figure: Cost of Goods Manufactured-$7,750, Net operating income-$10,750 What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? Viriat is the ending Dalance for work in process: What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? What is the adjusted cost of goods sold? What is gross margin? What is the total prime cost for job#1? What is the total conversion cost for job #1? What is the total product cost for job#1? What was the period cost incurred for the month of December? What is the total variable cost incurred for job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fiked.)? What is the contribution margin for job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)? What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is with in the relevant range? Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using job #1 Cost Sheet and Job #2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis. Table Top $1,900.00 $600.00 Table Leg Drawer $390.00 The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 12 direct labor hours worked during the month. The estimated manufacturing overhead cost for the month is: a. Factory supervisor salary per month b. Rent for the factory per month $4,500.00 $1,500.00 $600.00 $6,600.00 Depreciation of factory equipment per month Total Estimated manufacturing overhead What is the predetermined manufacturing overhbad rate? Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your job #1. Step 3 The customer that has ordered job #2, wants a table that is the same as job #1, but wants to also add a drawer to the table. Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense. Advertising expenses, and Depreciation expense. C Raw Materials purchased on account, $19,000. 5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: There are three assembly employees that spend 2 hours each, $25 per hour to make the table for job # 1. (After you journ. this entry please enter the information into Job #1 Cost Sheet) Salary for supervisor of the factory $5,000. Administrative Salary $2,000. 15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $1,500. 17-Dec Advertising costs incurred but not paid for the month was $1,200. 20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities). 22-Dec Manufacturing overhead cost was applied based on direct labor hours to job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet) 26-Dec Job #1 was completed and transferred to Finishell Goods during the month. 28-Dec The completed table from Job #1 was sold on account to the customer for $24,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $25 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet) Manufacturing overhead cost was applied based on direct labor hours to job #2 based on the POHR. Only three direct labor bure wara nad on Inh #7 during the month /Aftar uninurnalin this B 31. Dar 1-Dec 31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the er have been posted. Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS tab for job #1 and job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint: This is the company's first month of operations and therefore the beginning balances wi Step 6 be zero.) Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab. Answer the additional questions below Step 8 Check Figure: Cost of Goods Manufactured-$7,750, Net operating income-$10,750 What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? Viriat is the ending Dalance for work in process: What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? What is the adjusted cost of goods sold? What is gross margin? What is the total prime cost for job#1? What is the total conversion cost for job #1? What is the total product cost for job#1? What was the period cost incurred for the month of December? What is the total variable cost incurred for job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fiked.)? What is the contribution margin for job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)? What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is with in the relevant range? Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using job #1 Cost Sheet and Job #2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis. Table Top $1,900.00 $600.00 Table Leg Drawer $390.00 The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 12 direct labor hours worked during the month. The estimated manufacturing overhead cost for the month is: a. Factory supervisor salary per month b. Rent for the factory per month $4,500.00 $1,500.00 $600.00 $6,600.00 Depreciation of factory equipment per month Total Estimated manufacturing overhead What is the predetermined manufacturing overhbad rate? Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your job #1. Step 3 The customer that has ordered job #2, wants a table that is the same as job #1, but wants to also add a drawer to the table. Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense. Advertising expenses, and Depreciation expense. C Raw Materials purchased on account, $19,000. 5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: There are three assembly employees that spend 2 hours each, $25 per hour to make the table for job # 1. (After you journ. this entry please enter the information into Job #1 Cost Sheet) Salary for supervisor of the factory $5,000. Administrative Salary $2,000. 15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $1,500. 17-Dec Advertising costs incurred but not paid for the month was $1,200. 20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities). 22-Dec Manufacturing overhead cost was applied based on direct labor hours to job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet) 26-Dec Job #1 was completed and transferred to Finishell Goods during the month. 28-Dec The completed table from Job #1 was sold on account to the customer for $24,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $25 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet) Manufacturing overhead cost was applied based on direct labor hours to job #2 based on the POHR. Only three direct labor bure wara nad on Inh #7 during the month /Aftar uninurnalin this B 31. Dar 1-Dec 31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the er have been posted. Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS tab for job #1 and job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint: This is the company's first month of operations and therefore the beginning balances wi Step 6 be zero.) Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab. Answer the additional questions below Step 8 Check Figure: Cost of Goods Manufactured-$7,750, Net operating income-$10,750 What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? Viriat is the ending Dalance for work in process: What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? What is the adjusted cost of goods sold? What is gross margin? What is the total prime cost for job#1? What is the total conversion cost for job #1? What is the total product cost for job#1? What was the period cost incurred for the month of December? What is the total variable cost incurred for job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fiked.)? What is the contribution margin for job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)? What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is with in the relevant range? Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using job #1 Cost Sheet and Job #2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis. Table Top $1,900.00 $600.00 Table Leg Drawer $390.00 The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 12 direct labor hours worked during the month. The estimated manufacturing overhead cost for the month is: a. Factory supervisor salary per month b. Rent for the factory per month $4,500.00 $1,500.00 $600.00 $6,600.00 Depreciation of factory equipment per month Total Estimated manufacturing overhead What is the predetermined manufacturing overhbad rate? Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your job #1. Step 3 The customer that has ordered job #2, wants a table that is the same as job #1, but wants to also add a drawer to the table. Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense. Advertising expenses, and Depreciation expense. C Raw Materials purchased on account, $19,000. 5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: There are three assembly employees that spend 2 hours each, $25 per hour to make the table for job # 1. (After you journ. this entry please enter the information into Job #1 Cost Sheet) Salary for supervisor of the factory $5,000. Administrative Salary $2,000. 15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $1,500. 17-Dec Advertising costs incurred but not paid for the month was $1,200. 20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities). 22-Dec Manufacturing overhead cost was applied based on direct labor hours to job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet) 26-Dec Job #1 was completed and transferred to Finishell Goods during the month. 28-Dec The completed table from Job #1 was sold on account to the customer for $24,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $25 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet) Manufacturing overhead cost was applied based on direct labor hours to job #2 based on the POHR. Only three direct labor bure wara nad on Inh #7 during the month /Aftar uninurnalin this B 31. Dar 1-Dec 31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the er have been posted. Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS tab for job #1 and job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint: This is the company's first month of operations and therefore the beginning balances wi Step 6 be zero.) Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab. Answer the additional questions below Step 8 Check Figure: Cost of Goods Manufactured-$7,750, Net operating income-$10,750 What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? Viriat is the ending Dalance for work in process: What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? What is the adjusted cost of goods sold? What is gross margin? What is the total prime cost for job#1? What is the total conversion cost for job #1? What is the total product cost for job#1? What was the period cost incurred for the month of December? What is the total variable cost incurred for job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fiked.)? What is the contribution margin for job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)? What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is with in the relevant range? Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using job #1 Cost Sheet and Job #2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis. Table Top $1,900.00 $600.00 Table Leg Drawer $390.00 The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 12 direct labor hours worked during the month. The estimated manufacturing overhead cost for the month is: a. Factory supervisor salary per month b. Rent for the factory per month $4,500.00 $1,500.00 $600.00 $6,600.00 Depreciation of factory equipment per month Total Estimated manufacturing overhead What is the predetermined manufacturing overhbad rate? Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your job #1. Step 3 The customer that has ordered job #2, wants a table that is the same as job #1, but wants to also add a drawer to the table. Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense. Advertising expenses, and Depreciation expense. C Raw Materials purchased on account, $19,000. 5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: There are three assembly employees that spend 2 hours each, $25 per hour to make the table for job # 1. (After you journ. this entry please enter the information into Job #1 Cost Sheet) Salary for supervisor of the factory $5,000. Administrative Salary $2,000. 15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $1,500. 17-Dec Advertising costs incurred but not paid for the month was $1,200. 20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities). 22-Dec Manufacturing overhead cost was applied based on direct labor hours to job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet) 26-Dec Job #1 was completed and transferred to Finishell Goods during the month. 28-Dec The completed table from Job #1 was sold on account to the customer for $24,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $25 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet) Manufacturing overhead cost was applied based on direct labor hours to job #2 based on the POHR. Only three direct labor bure wara nad on Inh #7 during the month /Aftar uninurnalin this B 31. Dar 1-Dec 31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the er have been posted. Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS tab for job #1 and job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint: This is the company's first month of operations and therefore the beginning balances wi Step 6 be zero.) Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab. Answer the additional questions below Step 8 Check Figure: Cost of Goods Manufactured-$7,750, Net operating income-$10,750 What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? Viriat is the ending Dalance for work in process: What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? What is the adjusted cost of goods sold? What is gross margin? What is the total prime cost for job#1? What is the total conversion cost for job #1? What is the total product cost for job#1? What was the period cost incurred for the month of December? What is the total variable cost incurred for job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fiked.)? What is the contribution margin for job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)? What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is with in the relevant range? Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing (no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using job #1 Cost Sheet and Job #2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis. Table Top $1,900.00 $600.00 Table Leg Drawer $390.00 The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 12 direct labor hours worked during the month. The estimated manufacturing overhead cost for the month is: a. Factory supervisor salary per month b. Rent for the factory per month $4,500.00 $1,500.00 $600.00 $6,600.00 Depreciation of factory equipment per month Total Estimated manufacturing overhead What is the predetermined manufacturing overhbad rate? Step 2 The first order you received was to manufacture a table using a table top and four legs. This is your job #1. Step 3 The customer that has ordered job #2, wants a table that is the same as job #1, but wants to also add a drawer to the table. Step 4 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense. Advertising expenses, and Depreciation expense. C Raw Materials purchased on account, $19,000. 5-Dec All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: There are three assembly employees that spend 2 hours each, $25 per hour to make the table for job # 1. (After you journ. this entry please enter the information into Job #1 Cost Sheet) Salary for supervisor of the factory $5,000. Administrative Salary $2,000. 15-Dec All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $1,500. 17-Dec Advertising costs incurred but not paid for the month was $1,200. 20-Dec Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities). 22-Dec Manufacturing overhead cost was applied based on direct labor hours to job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet) 26-Dec Job #1 was completed and transferred to Finishell Goods during the month. 28-Dec The completed table from Job #1 was sold on account to the customer for $24,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $25 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet) Manufacturing overhead cost was applied based on direct labor hours to job #2 based on the POHR. Only three direct labor bure wara nad on Inh #7 during the month /Aftar uninurnalin this B 31. Dar 1-Dec 31-Dec Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold Step 5 Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the er have been posted. Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS tab for job #1 and job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint: This is the company's first month of operations and therefore the beginning balances wi Step 6 be zero.) Step 7 Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab. Answer the additional questions below Step 8 Check Figure: Cost of Goods Manufactured-$7,750, Net operating income-$10,750 What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? Viriat is the ending Dalance for work in process: What is the ending balance for finished goods? What is the actual manufacturing overhead cost incurred during December before adjustment? What is the total applied manufacturing overhead cost during December before adjustment? What is the unadjusted cost of goods sold? Was the manufacturing overhead for the month of December overapplied/underapplied? What is the amount of Manufacturing overhead overapplied/underapplied? What is the adjusted cost of goods sold? What is gross margin? What is the total prime cost for job#1? What is the total conversion cost for job #1? What is the total product cost for job#1? What was the period cost incurred for the month of December? What is the total variable cost incurred for job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fiked.)? What is the contribution margin for job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)? What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is with in the relevant range?
Expert Answer:
Answer rating: 100% (QA)
Step1 Predetermined manufacturing overhead rate 660012 550 Step2 Job 1 Cost of making the table Particulars Amount Direct material Table top 4 table l... View the full answer
Related Book For
Accounting
ISBN: 978-0324188004
21st Edition
Authors: Carl s. warren, James m. reeve, Philip e. fess
Posted Date:
Students also viewed these accounting questions
-
The beam is supported by a frictionless pin at A and a rocker at D. Draw a neat, labeled, correct free-body diagram of the beam and identify the reactions at point A and D. 12 kN A 45 B 2 m3 m- 21...
-
You have been asked to develop a work breakdown structure for a project. How should you go about accomplishing this? Should the WBS be time-phased, department-phased, division-phased, or some...
-
You have been asked to develop a work breakdown structure for a project. How should you go about accomplishing this? Should the WBS be time-phased, department-phased, division-phased, or some...
-
Using Porter's Five Forces Model, examine the impact of the market positioning on the selected product or service. Describe how each of the forces provides an advantage and disadvantage to the...
-
Coal-fired electricity-generating plants emit substantial amounts of sulfur dioxide and particulate pollution into the atmosphere. Concerned citizens are appalled at the aesthetic and environmental...
-
Eagle Stationery & Supplies Company sells jumbo highlighters at $160 per highlighter. The costs associated with each highlighter are as follows: Direct materials $65 Direct labour $42 Variable...
-
Examine how the rank of the stoichiometric matrix can be used to reduce the number of equations to be solved. For example, if there are \(n_{\mathrm{s}}\) components and \(n_{\mathrm{r}}\) equations...
-
On January 1, 2013, Lacey Tree toppers borrowed $300,000, which is to be paid back in annual installments of $20,000 on December 30 of each year. a. Assuming that Lacey has met all payments on a...
-
3. Determine whether each of these functions is 0 (x2). a. f(x) = 17x+11 b. f(x) = x + 1000 c. f(x) = x/2 d. f(x) = 2x e. f(x)= [x] [x]
-
The audit staff of Adams, Barnes & Co. (ABC), CPAs, reported the following audit findings in their 20X5 audit of Keystone Computers & Networks (KCN), Inc.: 1. Unrecorded liabilities in the amount of...
-
1. We acquired two new major customers that we will be shipping cardboard products to. One is located in Alberta and the other is located in the United States. The sale to the U.S. customer is our...
-
Using Target and Super Target as examples, answer the following questions. 1. What types of advantages do you see for each type of store? Discuss. 2. What are the benefits of becoming larger?...
-
Discuss and research which types of media AOK marketing should use in the USA and why? Look up what KlientBoost have done to successfully market their product internationally.
-
What can you expect from an industry in perfect competition in the long run? That is, what will the price be? What quantity will be produced? What will be the relation between marginal cost, average...
-
A falling object travels a distance given by the formula d=5t+6t2 d = 5t + 6t2, where d d is measured in feet and t t is measured in seconds. How many seconds will it take for the object to travel 57...
-
How would I solve this step by step. There are other questions on Chegg, but none of them explain how they got their answers. I want to know mathematically and and what equations to use to find the...
-
A manager is using the equation below to forecast quarterly demand for a product: Y t = 6,000 + 90t where t = 0 at Q2 of last year. Quarter relatives are Q1 =0.8, Q2 =0.9, Q3 =1.25, Q4 =1.15 What...
-
Charles owns an office building and land that are used in his trade or business. The office building and land were acquired in 1978 for $800,000 and $100,000, respectively. During the current year,...
-
Kenwood Homes, Inc., allows employees to purchase, at cost, manufacturing materials, such as metal and lumber, for personal use. To purchase materials for personal use, an employee must complete a...
-
The statement of members equity for Aztec Mines, LLC, is as follows: a. What was the income-sharing ratio in 2005? b. What was the income-sharing ratio in 2006? c. Do the member withdrawals in 2006...
-
Data related to the expected sales of golf balls and tennis balls for Medalist Inc. for the current year, which is typical of recent years, are as follows: The estimated fixed costs for the current...
-
You want to determine the mean age of all statistics instructors at the University of Colorado. representative Samples? In Exercises 1316, identify the sample, population, and sampling method. Then...
-
A sample of manufactured CDs is obtained by using a computer to randomly generate a number between 1 and 1,000 for each CD, and the CD is selected if the generated number is 1,000.
-
You want to predict the winner of an upcoming election for student body president. Suggest a sampling method that is likely to produce a representative sample. Explain why you chose this method over...
Study smarter with the SolutionInn App