Question: Structural modeling project - Spring 2 0 2 4 Due date / time The project must be submitted to Blackboard by Thursday May 2 ,
Structural modeling project Spring
Due datetime
The project must be submitted to Blackboard by Thursday May at : pm You can work in teams of up to
four students maximum. Please submit a fully typed report in PDF format presenting all your calculations and
conclusions. The task distribution sheet must also be filled and included in an appendix of the report. Put your
names and students ID numbers on the cover page. All hand calculations must be neatly typed not handwritten.
The units to be used in the analyses hand calculations and modeling are kilonewtons and meters.
Hypotheses
The bridge shown below is a rigid frame comprising a horizontal deck of width and depth
continuous with inclined legscrutches of similar crosssection. Linear springs of stiffness on top of
rigid abutments support the extremities of the deck. The crutches are connected to shallow foundations acting as pin
supports combined with angular springs of stiffness A uniformly distributed load
and a temperature gradient are applied to the deck. Take GPa and
Requirements
Hand calculations: using each of i the force method, ii the method of slopedeflection equations and iii the
method of moment distribution, determine the following:
a the internal forces and moments and at the center of the bridge's deck,
b the support reactions at the extremities of the deck and at the bottom of the crutches,
c the diagrams of and in the deck and in the crutches, and
d the vertical deflection at the center of the bridge's deck.
Model the structure using one of the structural modeling programs available at NDU, such as SAP ROBOT,
ANSYS, ABAQUS, RDM etc. and determine the same as in
Present a detailed table comparing all the results determined with all the methods used in and Analyze
the results and conclude.
Warning
All the team members must contribute equally to the project. Any discrepancies in this regard or any sign of
cheating, including subcontracting or plagiarism from any source, including the internet and previous project
reports will result in a grade of zero on the project and a letter grade of on the entire course.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock