Question: Subpart B: Systems Design & Development [ 0 . 5 points per question ] 1 . The different stakeholders of the aviation system: a Influence

Subpart B: Systems Design & Development [0.5 points per question]
1. The different stakeholders of the aviation system:
a Influence the design process
b) Offer various perspective on the development process
c) Contribute actively in the design and development process
d) All above are correct
e) None of the above are correct
Integrated product teams consist of
a) Prime contractors and supply chain
b) Customer representatives and contractors
c) Prime and secondary contractors
d) Engineering and Logistics
e) All above are correct
) None of the above are correct
3. Top-down development in aircraft systems means
a) The system functional characteristics are derived from the components* specs
b) The system is continuously developed from top to bottom
c) The cross function characteristics of systems are derived from integrated functions
d) All above are correct
e) None of the above are correct
4.
System integration cannot be different between the same types of aircraft
a)True
b)False

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!