The supply team continued daily support and maintenance for all the battalions, focusing on attending all required meetings, ensuring PSDs meet all suspense dates.
CDP Inspection- SFC Parson conducted the CSDP portion of the CDP with G4. The Supply section scored a 96%.
The FLIPL update with MS6 was 20 MAR. She and SFC Parson discussed closing the M249 FLIPL with the DCG-S.
The M4 range was this week as well. The S4 ensured they had MREs for Soldiers.