Question: Swimming Pool Installation: You are the project manager working for Mack's Pool Co. Your project consists of instaling a new swimming pool at the local



Swimming Pool Installation: You are the project manager working for Mack's Pool Co. Your project consists of instaling a new swimming pool at the local country club before Memorial Day weekend (pool opening weekend). You would like to find the minimum cost schedule for your project. There is a $9.000 per week penaity for each week the project is delayed beyond week 9 . In addition. your project team determined that indirect costs are $15,000 per week. Before crashing, the project duration is week(s). Swimming Pool Installation: The total cost of the project if we do nothing is $ (round to the nearest dollar). Swimming Pool Installation: The minimum cost schedule is week(s) (enter response as integer) . Swimming Pool Installation: The minimum cost schedule resulted in saving $ (enter response as integer). \begin{tabular}{|c|c|c|} \hline CRASHTIME(CT) & NormalCost(NC) & CrashCost(CC) \\ \hline 1 & 7,000 & 10,000 \\ \hline 2 & 3,000 & 3,000 \\ \hline 1 & 12,000 & 40,000 \\ \hline 2 & 12,000 & 28,000 \\ \hline 1 & 8,000 & 8,000 \\ \hline 3 & 5,000 & 15,000 \\ \hline 2 & 9,000 & 18,000 \\ \hline \end{tabular}
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts