Question: System design and analysis 1. By drawing the Project Network and applying CPM, find the Critical Path of the following project. (no need for Gantt

System design and analysis
1. By drawing the Project Network and applying CPM, find the Critical Path of the following project. (no need for Gantt Chart) (20 points) w Pred Activity eces Optimistic Time Realistic Time Pessimistic Time Expected Time Es Er Ls Slack sors A 4 5 6 B 7 B 9 C A 4 local 10 E B,C 6 y 8 D 4 6 3 4 5 7 H DStep by Step Solution