Question: system analysis and design critical path method 3. By drawing the Project Network and applying CPM, find the Critical Path of the following project. (no

 system analysis and design critical path method 3. By drawing the

system analysis and design critical path method

3. By drawing the Project Network and applying CPM, find the Critical Path of the following project. (no need for Gantt Chart) (20 points) Pred Activity eces Optimistic Time Realistic Time Pessimistic Time Expected Time Slack son A 5 8 FHH ho B A 7 8 3 5 D B 11 E D.C 8 7 8 la ly 5 6 6 3 3 D 5. 7