Question: TABLE 1: Green Way Project (Product development project) ID Task Name Duration Predecessors Resources 1 Market analysis 25 days 2 Product design 40 days 1



TABLE 1: Green Way Project (Product development project) ID Task Name Duration Predecessors Resources 1 Market analysis 25 days 2 Product design 40 days 1 3 Manufacturing study 20 days 1 4 Product design selection i days 2,3 Marketing (4) Marketing (1) Design (4) Development (1) Industrial (1) Purchasing (1) Industrial (3) Development (1) Marketing (2) Design (3) Development (2) Industrial (2) Purchasing (-25) Marketing (4) Design (1) Development (2) Industrial (4) Marketing (2) Design (4) Development (2) Industrial (2) Purchasing (25) Design (3) Development (2) 5 Detailed marketing plan 15 days 4 6 Manufacturing process 30 days 4 7 7 Detailed product design 50 days 4 8 Test prototype 10 days 7 9 Finalized product design 25 days 6,8 Marketing (2) Design (3) Development (3) Industrial (2) Purchasing (1) 10 Order components 7 days 9 11 Order production equipment 14 days 9 Purchasing (1) 12 Install production equipment 35 days 10.11 Development (3) Industrial (4) Design (1) Development (4) Industrial (4) Design (4) Marketing (4) Purchasing (1) 13 Celebrate 1 day 5,12 Part 1 1. When is the project estimated to be completed? (Based on Part 1 result) 21. August 2021 : 2. How long will the project take? (Based on Part 1 result) (Entre the numbers of days only) days 3. What is the critical path for the project? ID Task Name 1 Market analysis 2 Product design 3 Manufacturing study 4 Product design selection 5 Detailed marketing plan 6 Manufacturing process 7 7 Detailed product design 00 8 Test prototype 9 Finalized product design 10 Order components 11 Order production equipment 12 Install production equipment 13 Celebrate The OrbitTrack Company specializes in developing and selling a wide range of high-quality scooters. Sales representatives report that there is a growing demand for racing scooters. OrbitTrack's president, Jon Hala, is excited about the possibilities and predicts that one day these kinds of razor scooters will be featured in X-Game events. OrbitTrack is a small company and uses a strong matrix to optimally utilize limited manpower. Part 1 You are a member of a project team assigned to develop the new razor scooter code named ""Green Way. Table 1 contains the information necessary to create a project schedule. The project begins November 1, 2021
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
