Question: Table below is a time-phased net requirements for Widgets over the next six weeks along with the capacity constraint. The setup cost is $200 and

Table below is a time-phased net requirements for
Table below is a time-phased net requirements for Widgets over the next six weeks along with the capacity constraint. The setup cost is $200 and the holding cost is $0.30 per unit per week. Accounting for the capacity constraint, the modified requirements schedule, with improvement step, is: Note: Enter your answer as integer. (Hint: You want to minimize the total holding + setup cost)