Question: Table for Problem 9-8 TO FROM PROJECT PROJECT PROJECT CAPACITY PLANT 1 $10 $11 PLANT 2 $12 $8 PLANT 3 $9 $ 6 REQUIREMENTS 40

Table for Problem 9-8 TO FROM PROJECT PROJECT

Table for Problem 9-8 TO FROM PROJECT PROJECT PROJECT CAPACITY PLANT 1 $10 $11 PLANT 2 $12 $8 PLANT 3 $9 $ 6 REQUIREMENTS 40 60 9-9 Hardrock Concrete's owner has decided to increase the capacity at his smallest plant (see Problem 9.8 ). Instead of producing 30 loads of concrete per day at plant 3, that plant's capacity has been doubled to 60 loads. Does this change the schedule developed previously