Question: Table : Task time pizza assembly Task Description Task time (sec) Preceding task A Roll Dough 60 - B Add pizza source 30 A C
Table : Task time pizza assembly
| Task | Description | Task time (sec) | Preceding task |
| A | Roll Dough | 60 | - |
| B | Add pizza source | 30 | A |
| C | Sprinkle cheese | 35 | B |
| D | Add sausage | 25 | C |
| E | Add Pepperoni | 35 | C |
| F | Add Mushrooms | 22 | C |
| G | Shrink-wrap pizza | 15 | D,E,F |
| H | Add label | 23 | G |
| Total time | 245 sec |
Table above shows the task time and precedence relationships for a pizza assembly. The product time per day is 8 hours and the production schedule requires 300 pizzas per day by the assembly time.
- Draw the precedence diagram of the operation.
- Determine the cycle time of the line.
- Calculate the minimum number of workstations for this operation.
- Construct the line layout of the operations following by rules below:
- Longest task time rule.
- Number of following rules.
- Compute the resulting efficiency and balance of delay percentages.
- If a worker is paid RM35 per day, compute the cost of idleness per week (assuming a work 6-day week).