Question: Take Quiz : 5 pts Question 1 ce lf not enough liquid is metered in the evaporator, the evaporator will floodback O shut down starve
Take Quiz : 5 pts Question 1 ce lf not enough liquid is metered in the evaporator, the evaporator will floodback O shut down starve turn off Question 2 5 pts Which refrigerant metering device maintains a constant pressure in the evaporator while the compressor is operating? O Automatic expansion valve O Capillary tube Metering orifice Thermostatic expansion valve Question 3 5 pts After a capillary tube system shuts off, ; 1 delay of minute(s) must be allowed before restarting () 2105 Ca 15 to 20 Question 4 eet
Step by Step Solution