Question: takeoff collar on heating duct system. The engineer used continuous timing and recorded the observations in the following table along with a performance rating for
takeoff collar on heating duct system. The engineer used continuous timing and recorded the observations in the following table along with a performance rating for each task. The allowance factor for the job is percent. All times are in minutes.
tableCyclePRFCut hole,Insert collar,Fold down flaps,Apply sealant,
What is the standard time for the Apply sealant step?
a minutes
b minutes
c minutes
d minutes