Question: Task a Duration (minutes) 0.2 Immediate Predecessor b 0.4 a CA24 60 0.2 b d 0.4 e 1.2 d f 1.2 g 1.0 e,


Task a Duration (minutes) 0.2 Immediate Predecessor b 0.4 a CA24 60 0.2 b d 0.4 e 1.2 d f 1.2 g 1.0 e, f Do each of the following: a. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time. (Round your answers to 1 decimal place.) The minimum cycle time 1.2 minutes per unit The maximum cycle time Calculated cycle time 4.6 minutes per unit 2.0 minutes per unit b. Determine the minimum number of stations needed. (Round your answer to the next whole number.) Minimum number of stations 3 c. Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice. Work stations Following Tasks A, B, C, D II E III IV IF G d. Compute the percentage of idle time for the assignment in part d. Use the actual bottleneck cycle time in your calculation. (Round your answer to 2 decimal places.) Percentage of idle time 57.50%
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts