Question: Task time estimates for the modification of an assembly line at Robert Klassen's Ontario factory are as follows. Immediate Predecessor(s) Activity A B C CU


Task time estimates for the modification of an assembly line at Robert Klassen's Ontario factory are as follows. Immediate Predecessor(s) Activity A B C CU OULU Time (in hours) 7.0 6.5 4.0 7.0 4.0 7.0 4.0 A B, C B, C D E, F This exercise contains only parts d, b, and c. d) Use the multipoint curve drawing tool five times, draw a Gantt chart for activities C through G of the project based on the early times. Carefully follow the instructions above, and only draw the required objects. A B D F G 0 0 EN 4 6 +00 10 12 14 16 18 20 22 24 26 28 30 (6,5)