Question: Ten jobs must be processed by two machines sequentially. Each job is processed by machine 1 first. After the job is processed by machine 1,

Ten jobs must be processed by two machines
Ten jobs must be processed by two machines sequentially. Each job is processed by machine 1 first. After the job is processed by machine 1, a robot moves the job from machine 1 to machine 2. The job is then processed by machine 2 before it is moved to the inventory by the robot. Figure 1 below shows process times in seconds) of the two machines and robot movements. A job may stay in machine l or machine 2 longer than the required process time. Machine I can process only one job at any time. A job may access machine 1 if no other jobs are currently in machine 1. Machine 2 has a capacity of 3 jobs. A maximum of 3 jobs may be processed by machine 2 at any given time. There is only one robot, and the robot can move only one job at any time. Please formulate an integer programming model to determine the schedule that minimizes the total flow time of completing all 10 jobs. Start 50 540 160 220 Machine 1 Machine 2 Figure 1. Process times of a manufacturing system. Inventory

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!