Question: Textbook: Niebel's Methods, Standards, & Work Design (13th Edition) 3. (20 pts) Time study (Ch-10) a) (14 pts) Complete the time study by filling in

Textbook: Niebel's Methods, Standards, & Work Design (13th Edition) Textbook: Niebel's Methods, Standards, & Work

3. (20 pts) Time study (Ch-10) a) (14 pts) Complete the time study by filling in the circles. Time Check Time Study Observation Form Study No.: Finishing Time Operation: Starting Time Elapsed Time Element No. andj Description A B TEBS 4.5 TEAF CH Note Cycle R W OT NT R W OT NT Total Check Time 1 110 55 Ge H1075 1 Je Effective Time 2 130 83 130 00 Me Ne Ineffective Time Fe Total Recorded Time Unaccounted Time Recording Error % Windows [1] Windows Standard time b) (3 pts) Calculate a standard time for an 8-hr job. Assume a 10% allowance. c) (3 pts) The above operator was performing above standard performance, because he was on a standard hour plan at a base rate of $12.00/hr. Calculate what the operator would lose ($/hr) if the IE rated the worker at 100% across the board. De E A Be Ke Le

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!