Question: Th- 14) M-Tu 5 Question 2 (1 point) Which statement is correct? O 1) In the push method of work flow, work is retrieved from

Th- 14) M-Tu 5 Question 2 (1 point) Which
Th- 14) M-Tu 5 Question 2 (1 point) Which statement is correct? O 1) In the push method of work flow, work is retrieved from the previous (upstream) station 2) in the pull method of work flow, production is triggered by customer demand. 3) In the pull method of work flow, production starts at the lowest level of the bill of material. 4) In the push method of work flow, demand is experienced, rather than forecasted. 8 Question 3 (1 point) Problem data: Job A B Time (days) since arrival 5 4 3 Estimated days required 8 7 5 Days until due 11 9 19 - acer