Question: The B / C ratio for a flood control project along the Swanee River was calculated to be 1 . 8 0 0 . If
The BC ratio for a flood control project along the Swanee River was calculated to be If the benefits were $ per year and the maintenance costs were $ per year, determine the initial cost of the project at an interest rate of per year and a year life. Round the final answer to three decimal places.