Question: The basic objective of facility layout design is Group of answer choices To avoid bottleneck To use workers and space more efficiently To improve product/service
The basic objective of facility layout design is Group of answer choices To avoid bottleneck To use workers and space more efficiently To improve product/service quality To facilitate a smooth flow of work and material through the systemYou are appointed by Air Queen Inc to set up a new electric fan assembly line at its Modesto facility. The company estimates the demand would be 700 units per week. The assembly line is designed to run 8 hours per day and 7 days per week. Your goal is to use line balancing to design a product layout that can minimize the number of required workstations to complete enough units to satisfy the demand estimate. The table below is provided to you by the company, specifying all the tasks and the corresponding precedence relationships. What is the cycle time (in minutes) needed to produce the required number of units? Task Time (mins) Description Predecessors A 2.6 Assemble frame None B 2.1 Assemble motor housing None C 2.2 Mount motor housing in frame A,B D 1.2 Attach blade C E 1.8 Assemble and attach safety grill D F 2 Test E Group of answer choices 7 4.80 0.21 8
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
