Question: The case Probability and Impact discusses about Procedure to analyze risk and development of threshold Develop risk analysis and assessment procedure Changing risk threshold and

The case "Probability and Impact" discusses about

Procedure to analyze risk and development of threshold

Develop risk analysis and assessment procedure

Changing risk threshold and assign appropriate risk

Project monitoring and control procedure

3.Risk threshold is used to report risk of ______________ to higher management

High severity

High probability

Listed on the threshold

4.A normal risk threshold may ignore

Low probability high impact risks

Low impact high probability risks

Medium probability high impact risks

Medium impact high probability risks

5.What should Salvador do to address the issue?

Adjust the risk threshold to include low probability high impact risk as priority

Qualitative assessment because adjusting threshold will include many low value risks

Do not change and keep things as it is

Tell high management about the issue and get advice

CASE STUDY : Case Study - Probability and Impact

Salvatore Adamo was the head of Vintel Corp s Risk Management Department. His responsibility was to manage risks for many of the company s products. However, one particular product had major risk implications and mattered to Salvatore the most. It was Vintel s fl agship product and had a very important risk event at stake. The risk at stake had a very low probability of occurring but had a huge potential impact on the company and its future. This was the fi rst time in the company s history that a product with such a low probability risk event could lead to such enormous potential impact. This case presents how Salvatore adjusted Vintel s risk analysis procedure to address this type of risk. RISK ANALYSIS STEPS In order to effectively manage risk for Vintel s product, Salvatore typically followed the standard procedure. He started off with the identifi cation of all potential risks. He then identifi ed the probability and impact of each risk, using a 1 - to - 5 point scale. For each risk, the risk score was then calculated based on a set formula (Probability + 2 Impact). He then used a Risk Rating table with predetermined thresholds to categorize risks into high (red), medium (yellow), and low (green) severity risks. Typically, the threshold for high risk is 12 and above. Medium risks have a score ranging from 8 to 11. Risks that score below 7 are considered low risks. Usually high risks will get more management attention and Vintel will perform further investigation and come up with appropriate response plans. Medium and low risks will get less management oversight. The use of this procedure would ensure that risks are analyzed in a systematic manner based on their probability and impact. ADJUSTING THE THRESHOLDS Salvatore knew from past experience that in general a very low probability risk event does not have as high a potential impact or a severe outcome. In such a typical situation, using the Risk Rating table in Figure 11.1 should work fi ne. But for this fl agship product, a lot of very low probability risks have a very high level of impact, and using his normal Risk Rating table may not be appropriate. Am I right? Salvatore thought. 246 CASE STUDIES I think I am, Salvatore talked to himself. He knew that he had to adjust his risk thresholds, such that those risks are in the category of high risk. Salvatore had a flashback to his experience with Ford Australia. Several years ago when Salvatore visited Ford Australia for technical exchange, he participated in risk analysis training. One of the risk events they discussed was the SUV tire explosion. Typically, tire explosion is a very low probability risk event . But when it happens, it can cause the vehicles to rollover, which can lead to the severe injury or death of the passengers in the SUV. Besides the safety of the passengers at stake, tire explosion should impact the sales of the SUV by as much as $ 5 billion. This was definitely a high risk. This flashback assured Salvatore that the risk thresholds needed to be adjusted. If not for this flagship product, a risk event like tire explosion would always end up being a medium - level risk and would never get as much management attention as it should. No management attention means no further analysis and no support. Then, if the risk happens, he could not imagine how huge the impact would be. Probably not $ 5 billion but it would definitely be ugly and no more future for me at Vintel, thought Salvatore. Discussion items 1. Would adjusting the threshold be the right move for Salvatore? If it is, what should the new threshold be to account for the very low probability and very high impact risks? 2. Would adjusting the thresholds be the only solution? What else should Salvatore introduce to Vintel such that risks get proper management attention?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!