Question: The city engineer and economic development directors are evaluating two sites for construction of a multipurpose sports arena. The sites are downtown ( DT )
The city engineer and economic development directors are evaluating two sites for construction of a multipurpose sports arena. The sites are downtown DT and southwest SW of the metropolitan area. The city already owns enough land at the DT site; however, the land for a parking garage will cost $ million, and construction costs will be $ million for the parking garage, infrastructure relocation, and drainage. The SW site is km from downtown, but the land will be donated by a developer who knows that an arena at this site will dramatically increase the value of the remainder of his land holdings. Because of its centralized location, there will be greater attendance at most of the events held at the DT site. This will result in more revenue to vendors and local merchants in the amount of $ per year. Additionally, the average attendee will not have to travel as far, resulting in annual benefits of $ per year. All other costs and revenues are expected to be the same at either site. If the city uses a discount rate of per year, and will construct at one site or the other, which site should be selected? Use a year study period.
The Delta BC ratio is
Select site
Click to select
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock