Question: The correct answer is b . Consecutive measurements are taken. One observes that the system failed to respond only at one, single measurement. In this

The correct answer is b. Consecutive measurements are taken. One observes that the system failed to respond only at one, single measurement.
In this scenario, the system is designed to respond to a certain input, but it fails to do so in only one instance. This failure is observed through consecutive measurements, indicating a consistent issue. The other options are incorrect because they do not accurately depict a single point of failure:
a. The technical experts know that the system has at least one defect: This option describes a situation where experts are aware of multiple defects or issues within the system, which is not the definition of a single point of failure.
c. The technical expert realizes that one single defect creates most of the problems: This option suggests that a single defect is responsible for most of the issues within the system, which is not a characteristic of a single point of failure.
d. Only one, single project team member has the required skill: This option does not relate to the concept of a single point of failure. It describes a situation where a team member possesses a specific skill, which is not a defining feature of a single point of failure.
Final answer: Therefore, option b is the correct example of a single point of failure, as it demonstrates a situation where a system fails to respond consistently due to a specific issue.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!