The costs associated with the two alternatives, codenamed Q and R, evaluated by Albiston Corporation are listed
Fantastic news! We've Found the answer you've been seeking!
Question:
The costs associated with the two alternatives, codenamed Q and R, evaluated by Albiston Corporation are listed below:
Alternative Q | Alternative R | ||||||
Material costs | $ | 75,000 | $ | 75,000 | |||
power costs | $ | 34,700 | $ | 33,900 | |||
Inspection costs | $ | 28,000 | $ | 33,900 | |||
Assembly costs | $ | 41,000 | $ | 41,000 | |||
Necessary:
a. Which costs are relevant and which are not relevant in choosing between these two alternatives?
b. What is the difference cost between the two alternatives?
Note: Below, list each cost in (a.) as relevant or not. List a numeric number for the differential cost for (b.)
a. Material costs
power costs
Inspection costs
Assembly costs
b. Different cost