Question: The costs to manufacture a part using methods A and B are estimated by C A = 2 0 + 0 . 8 P and
The costs to manufacture a part using methods A and are estimated by and
respectively, where the cost is in dollars and is the number of parts. Estimate the breakeven point.
The breakeven point occurs at
parts.