Question: The diflerence between the upper specification and the lower specification for a process is 0.70 . The standard deviation is 0.15 . Based on the

The diflerence between the upper specification and the lower specification for a process is 0.70 . The standard deviation is 0.15 . Based on the given information, the prociss capabily ratio, \( C_{p} 