Question: The following are the data for a particular bit run: rig cost $ 1 5 0 0 h r . , bit cost $ 3

The following are the data for a particular bit run: rig cost $1500hr., bit cost $3000, depth
in 6000 ft , depth out 7500 ft , trip rate 1500fthr. and drilling rate 25fthr. if it was
expected that the bit drills 20fthr., what is the savings realized by using this bit?