Question: the lead time as below ? Painting and final assembly of both TOL requires 2 weeks. Both cabinet frames and lock assembly require 1 week
the lead time as below ?
Painting and final assembly of both TOL requires 2 weeks.
Both cabinet frames and lock assembly require 1 week for manufacturing.
Both drawer assemblies require 2 weeks for assembly.
Both sliding assemblies require 2 weeks for manufacturing.
Bearings require 2 week to arrive from the supplier.
QUESTION 1: The Hunicut and Hallock Corporation makes two versions of the same basic file cabinet, the TOL (Top-of-the-line) five drawer file cabinet and the HQ (High-quality) five drawer filing cabinet. The TOL and HQ use the same cabinet frame and locking mechanism. The drawer assemblies are different although both use the same drawer frame assembly. The drawer assemblies for the TOL cabinet use a sliding assembly that requires four bearings per side whereas the HQ sliding assembly requires only two bearings per side. (These bearings are identical for both cabinet types.) 100 TOL and 300 HQ file cabinets need to be assembled in week #10. No current stock exists. TOL(100) HQ(300) Cabinet frame and lock assembly (1) TOL Cabinet drawer frame and assembly (5) lock assembly (1) HQ drawer assembly (5) Drawer frame assembly (1) TOL sliding assembly (1) Drawer frame HQ sliding assembly (1) Bearings (8) Bearings (4) Develop a net material requirements plan for the TOL file cabinets in the previous problems assuming a current on-hand finished goods inventory of 100 TOL cabinets. The lead times are given belowStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock